The Royal Institute of British Architects (RIBA) plan of work is the definitive model for the building, together with Building Information Modelling (BIM), the designers, constructors, material and equipment supplier produce a building fulfilling the clients requirements. the seven stages of the process following the Clients Strategic Definition(often called stage zero) are:
RIBA Plan of Work >- Preparation and Brief
- Concept Design
- Developed Design
- Technical Design
- Construction
- Handover and Close out
- In Use
Operation of the Facility, Maintenance, and finally Decommissioning and Demolition are considered at every stage of the project.